Typical In-place Decommission Projects
(Click images for larger view)
Tank is decommissioned
Tank is decommissioned
Lawn will be good as new
Lawn will be good as new
Sometimes we just have to go in
Sometimes we just have to go in
They'll never know we were here
They'll never know we were here
This tank has been opened and cleaned
This tank has been opened and cleaned
This tank has not been cleaned yet
This tank has not been cleaned yet



CDF (Control Density Fill) Decommission
Return To Top
(Click images for larger view)
CDF to concrete pump hoper
CDF to concrete pump hopper
Hose from concrete pump to tank fill pipe
Hose from concrete pump
to tank fill pipe



Typical Excavation Projects
Return To Top
(Click images for larger view)
Prepairing to remove tank
Preparing to remove a tank
This tank was in bad shape
This 340 gallon tank
was in bad shape
Excavation looks clean
This excavation looks clean
Drain line contributed to the mess
This drain line contributed
to the mess
Removing a tank
Removing a Tank
A large hole in a tank
A large hole in a tank
Removing soil
Removing Contaminated Soil
Comtaminated soil
Contaminated Soil Remains



Above Ground Storage Tanks
Return To Top
(Click images for larger view)
135 gallon AST
135 gallon AST
275 gallon AST
275 gallon AST
Form and re-inforcements for AST.gif
Form and re-inforcements for AST